Arrow Image
Left Arrow View All Projects

نشر في الفئة

كفر الشيخ

Implement A New Treatment Plant In Desouq City

  • Type

    Recycling Plant
  • الجدول الزمني

    6 Months
  • Bugdet

    EGP 15,000,000

Objective(s)

  • Prevent the waste accumulation in the future.
  • Increase waste segregation efficiency and the quantity of recycling materials.
  • Minimize the quantity of waste goes to landfill.
  • Creating new jobs.
  • Improve the primary and secondary transportation of waste.
  • Prevent the burning of waste and protect the environment and human health.

Environmental and Social Impact

Expected Results

  • Creating new jobs.
  • Private sectors participation in the operation.
  • Save the diseases and drugs expenses resulting from the pollution prevention and environmental protections.

  • Implement a new treatment plant with mobile equipment in Desouq dumpsite (Tal Matiuor) to receive the daily generated waste from Desouq and Feawh Markaz. An estimated 630 tons of waste are generated daily in the communities that will be served by the immediate priority measure.
  • Residual waste (estimated to be approx. 20 percent of input waste) will be transferred to Metobus dumpsite.
  • Use of mobile equipment provides operational flexibility to meet future needs.

Implemented By

Contractor (NOMP)

Problems to be Addressed

Prevention of accumulations by creating a treatment facility for materials generated in the project zone. Reduction of 80 percent (estimated) in quantity of waste requiring disposal in Metobus (28-40 km one way), and reduction in cost of disposal.