Arrow Image
Left Arrow View All Projects

نشر في الفئة

الغربية

El Santa Pilot Project – Gharbeya Governorate

  • Type

    Primary Waste Collection
  • الجدول الزمني

    March 2018 - Present
  • Bugdet

    N/A

Objective(s)

The system depends on the households and shops putting their source-separated waste (organic/recyclable) in different bags in front of the building at a certain time. Then a truck (3 tons) collects the bags (dry fraction two-weekly; organic fraction daily) and brings the waste to El-Sadat landfill by a big truck.

Environmental and Social Impact

Expected Results

The area is cleaner than before starting the implementation of the model and waste is collected on a regular basis.

Implemented By

LGU

Problems to be Addressed