Arrow Image
Left Arrow View All Projects

Posted in Category

Kafr Sheikh

Implement A New Recycling Plant In Metobus Dumpsite

  • Type

    Dumpsite Rehabilitation
  • Timeline

    6 Months
  • Bugdet

    EGP 15,000,000

Objective(s)

  • Prevent the waste accumulation in the future.
  • Manage the site operation in the right way.
  • Increase waste segregation efficiency and the quantity of recycling materials.
  • Creating new jobs.
  • Protect the human health and environment from the pollution coming from the burned waste.

Environmental and Social Impact

Expected Results

  • Creating new jobs.
  • Organize the operation in the dumpsite.
  • Save the diseases and drugs expenses resulting from the pollution prevention and environmental protections.

  • Implement a new temporary recycling plant with mobile equipment in the proposed site in Metobus City to receive the daily generated waste from Metobus, El Hamoul, and Baltim Markazs and Borg El Borolos City. Waste generated in these areas is estimated at 620 tons per day. Outputs will include recyclable materials, compost and RDF.
  • Use of mobile equipment provides operational flexibility to meet future needs.

Implemented By

Contractor (NOMP)

Problems to be Addressed

Reduction of 80 percent (estimated) in quantity of waste requiring disposal in Metobus from Metobus, El Hamoul, and Baltim Markazs and Borg El Borolos City.