Rehabilitation, Repairing The Broken Equipment (Compactor-loader), Spare Parts and Training On Good Operation For Sadat Landfill

  • Type

    Rehabilitation
  • Timeline

    5 Months
  • Bugdet

    EGP 3,000,000

Objective(s)

  • To contain all the design capacity.
  • Apply the right environmental steps for filling the cells with waste.
  • Rehabilitation of the leachate and gases nets.
  • Rehabilitation of the drying basins.
  • Repairing the non-working equipment.
  • Creating new jobs.
  • Protect the human health and environment from the pollution coming from the burned waste.

Environmental and Social Impact

Expected Results

  • Creating new jobs.
  • Private sectors participation in the operation
  • Local manufacture of modification cells.
  • Save the diseases and drugs expenses resulting from the pollution prevention and environmental protections.

  • Rehabilitation of landfill cells at Sadat landfill.
  • Increase of the vertical extension of the cells so that the cells reach the design height.
  • Site operation rearrangement.
  • Repairing the non-working equipment.
  • Rehabilitation of the drying basins.
  • Rehabilitation of the leachate and gases nets.

Implemented By

Contractor (NOMP)

Problems to be Addressed

Poor operation of Sadat waste disposal site that does not adequately protect human health and the environment.