Kafr Sheikh

Treat The Accumulation Waste In Beiala and Sedi Salem Treatment Plants

  • Type

    Accumulation Removal
  • Timeline

    6 Months
  • Bugdet

    EGP 6,000,000

Objective(s)

  • Remove the accumulation for good operation.
  • Find a free space for establishing new recycling line specially in Sedi Salem site.
  • Prevent the waste accumulation in the future.
  • Minimize the quantity of waste goes to landfill.
  • Creating new jobs.
  • Prevent the burning of waste and protect the environment and human health.

Environmental and Social Impact

Expected Results

  • Creating new jobs.
  • Private sectors participation in the operation.
  • Save space of land for a new line of segregation and recycling
  • Save the diseases and drugs expenses resulting from the pollution prevention and environmental protections.

Mobile equipment (loader, trammel screen) will be used to screen accumulated waste to recover fine materials that can be utilized.

Implemented By

Contractor (NOMP)

Problems to be Addressed

Inadequate operations result in the current accumulation of approximately 20 ton/day of untreated waste at Beiala, in addition to the old accumulation of waste about 200,000 tons in both plants. Waste in the two plants burns continuously, causing environmental pollution and impacting public health.