El Mahalla Pilot Project – Gharbeya Governorate

  • Type

    Primary Waste Collection
  • الجدول الزمني

    March 2018 - Present
  • Bugdet

    N/A

Objective(s)

Households and shops put their source-separated waste (organic/ recyclable) in different bags in front of the building at a certain time. Then a truck (3 tons) collects the bags (dry fraction two-weekly; organic fraction daily) and brings the waste to El-Mahala CP by a big truck. For the small industries the focus is on the separate collection of textile as this fraction currently is included in the mixed waste and causes operational problems at the CP.

Environmental and Social Impact

Expected Results

Implemented By

LGU

Problems to be Addressed