Arrow Image
Left Arrow View All Projects

Posted in Category

Assuit

Purchasing 4 Roto Press Compactor Semitrailer 30 m3

  • Type

    Equipment
  • Timeline

    N/A
  • Bugdet

    EGP 27,670,669

Objective(s)

  • Prevent the waste accumulation in the future.
  • increasing the overall solid waste management system efficiency.
  • increasing the efficiency of waste collection and transportation into transfer station and disposal site.

Environmental and Social Impact

Expected Results

  • Creating new jobs.
  • Private sectors participation in the operation.
  • collect the waste from the city and villages in the Markaz.
  • More efficiency for transportation of waste into transfer station and disposal site.
  • Proper environmental impact
  • No accumulation of waste in cities and village

  • Increase the efficiency of solid waste transportation to the MBT and controlled dumpsite located in Assuit Governorates.
  • Prepare procurement, tender document and other documents specialized for delivering this equipment
  • Mitigation measures to reduce recent emissions of the open uncontrolled dumpsite.

Implemented By

Contractor (Joint venture Al - Salhiya Company for Metal and Technical Industries for Engineering Services)

Problems to be Addressed

Increasing the efficiency of waste transportation.